• Minimize shore handling costs for sludge
  • Easy to handle
  • 30 minutes per running sequence
  • Can either be used in fully automatic — continuous operation or semi automatic
  • Heater supplied with the unit if necessary
  • Available in two sizes 300 liters or 500 liters
  • Easy to install in existing systems

  

Downloads for Sludge Dewatering Unit

{module Documents - Sludge Dewatering Unit}