- Minimize shore handling costs for sludge
- Easy to handle
- 30 minutes per running sequence
- Can either be used in fully automatic — continuous operation or semi automatic
- Heater supplied with the unit if necessary
- Available in two sizes 300 liters or 500 liters
- Easy to install in existing systems
Downloads for Sludge Dewatering Unit
{module Documents - Sludge Dewatering Unit}